Archer's resume

Home
On Going Project
Achievements
Photo's
Guest Book
Contact me
Links
me_ctjv.jpg

The information below is not intended for employment. Employers, agencies and other manpower recruiting resources must not treat this web site as for employment purposes. Thank you for viewing. 

Objectives

To be part with in a dynamic progressive company where I can use and apply my professional work experience. Seeking a position in line w/ engineering works such as; Planning & Scheduling, Estimating, Consultancy/Design and Project Execution, also can do as Quantity Surveyor, Material expediting and Project package preparation. To obtain a position in engineering, construction and maintenance wherein my knowledge and experience will be used to the full extent.

Summary of Experience

With dedicated work experience in various technical and engineering disciplines. Works involved in LNG Construction Process Area, Mining Plant Site, Mechanical Design, Piping, Chilled Water Piping (CHWP), Fabrication and Installation, Project Planning preparation with the use of Primavera V3.1, P5/P6 & Microsoft Project in application of SAP System & JD Edwards. Can be able to developed Designs and Drawings thru AutoCAD R.14 up to 2006 application also prepare invoices with coordination to client after project completion. Previously engaged with multi-national, int’l. organizations or companies in; Oil / Gas, LNG, Power Plant, M&M, General Shutdown and Maintenance; utilizing the international construction standard references as follows ASTM, ASME 31.1 & 31.3, ASME IX, AWS,  ASHRAE, API & ISO 9001:2002 certification.

 

Detailed Experience:

 

July 2011 – Present  MONADELPHOUS ENGINEERING

Address: Level 6 Lang Parade, Milton Queensland 4064 Australia

Planner/Scheduler

 

- Prepare tender schedules. Develop baseline schedule, monitor and coordinate with PM's and construction personel for the project's success.

Projects:
- Eurombah Creek APLNG Upstream Phase 1 – Gas Fields Facilities JUL 2014 – MAY 2015




- Lead Planner : Wandoan Interconnect Facilities APLNG FEB 2014 – JUL 2014




- Wheatstone LNG Project 2013 - 2014



- Rio Tinto Kestrel Mine Brownfield CHPP Project 2011 - 2013

 

Sept. 22, ’08 – Feb 2011     SNC LAVALIN INTERNATIONAL INC. (Toronto, CA)

Ambatovy “Nickel/Cobalt” Project (EPCM)

Client: OPG “Owner Project Group”(Sherritt Intn’l., Sumitomo and Korea Resources)

Fokontany d’ Amboakarivo, Commune d’ Amboditandroho, TOAMASINA II - Madagascar 

Snr. Planner/Scheduler

 

Report to Project Controls Manager, to ensure planning works for the Engineering, Procurement, Construction and Management of the Ambatovy Nickel/Cobalt Project. Fact about the project; The Ambatovy Project is a laterite Nickel/Cobalt open pit mining operation located in the east central highlands of Madagascar near the city of Moramanga. 220KM slurry pipeline will be constructed, which will carry processed ore from the mine site to the processing plant as well as the a port, an eight km railway, 130 km of access roads and an industrial complex. The processing plant will be constructed near the port city of Tamatave (Toamasina) located on the east coast of Madagascar. The US $3.38 Billion facility will produce 60,000 tonnes per year of Nickel, 5,600 tonnes per year of Cobalt and 185,000 tonnes per year of Ammonium Sulphate.

Duties and responsibilities:

-    Develop, maintain, and implement the Project Code of Accounts. Develop, maintain, and implement the Cost Control Procedures. Prepare definitive capital cost estimate and Project budgets.

-    Evaluate and cost code capital cost commitments, expenditures, material quantities, contractor’s man-hours, progress and performance, and project services.

-    Prepare Project trends and forecasts to update the Project final cost projections to be included in the Monthly Progress Report. Prepare Bid check estimates of Bid Packages; assist Contracts and Procurement in Bid evaluation and recommendations. Monitor the recording of commitments and expenditures in conjunction with the Project Accounting Section. Monitor the Project scope and obtain approvals for Project Scope Changes.

-    Review Purchase Orders and Contracts for compatibility with the budget. Also provide cost codes and budget breakdown values to Contracts and Procurement for Bid analysis and award recommendations.

-    Monitor supplier’s/contractors periodic reports to the Project Controls Department.

-    Update the following documents in a Monthly basis:

o         Master Summary Schedule (Rainbow).

o         Engineering and Construction Progress Charts.

o         The Detailed Project (CPM) Schedule.

o         Early Activities Schedule.

o         Overall contract progress and performance curves.

o         Contractors’ proposed and actual schedules, progress charts.

o         Schedule requirements to reflect any contractual or legal documentation and requirements.

-    Produce the following documents:

o         Commitment Package Status Report. Submit a Monthly Progress Report. List of Key Dates.

o         Establish Intermediate Milestones dates for Contract Documents.

o         Overall Home Office Progress Curve. Engineering Progress Curve. Manpower Status Report.

o         Critical Items List – Analyze “Actual“against the Schedule and report critical delays and needs to enable Management to take corrective actions. Maintain “activity sorting” capabilities of the schedules.

o        Produce Gantt charts for various special project reporting.

Dec. 20, ’06 – Jul.12,'08     CTJV- Chiyoda/Technip Joint Venture RGX6

RasGas LNG Onshore Expansion Project Phase 2

Client: Partnership of RasGas and ExxonMobil Ras Laffan (III) Limited

P.O.Box : 22740, Ras Laffan Industrial City (RLIC), State of Qatar 

Snr. Construction Planner/Analysts – Process

Report to Construction Manager, to ensure planning works of Construction Group for CTJV, Japan's Chiyoda and France's Technip Joint Venture, for the engineering, procurement and construction of the RasGas onshore projects trains 6 and 7. Two additional LNG trains, no. 6 and no. 7. This is a new offshore wells, the largest producing wells in the industry. Each train is designed to produce 7.8 million tonnes per year of liquefied natural gas, making them two of the world's largest LNG trains. ($4 Billion USD Project).

§          Main Task:

-          Works involve in Construction Project Planning, extract detailed work activities, with Primavera V.3.1 and MS (Microsoft) Project 2003.risk management plan.

-     Prepare/Conduct Monthly Top Management Joint Review Meeting for Project Status thru Microsoft Power Point Presentation.

-          Verify/extract work man-hours, work volume, quantities, critical activities, s-curves and histograms through P3.

-          Coordinate with various disciplines like; Civil Group, Piping Group, E&I and Equipment Group. As well as coordinate to subcontractors relating to construction works for proper work execution at site and ensure proper planning. Coordinate with logistics for the Material and Equipments ETA (Estimated Time Arrival) and ATA (Actual Time Arrived) prior to allocating it to Laydown yard and/or installation.

-          Update/submit Weekly Progress Report for all discipline thru S-Curves and Histogram as well as various plans, for Process Access Roads, Equipment Positioning and alignment at Laydown area with AutoCAD 2006 and (Bentley) Microstation. Review and analyze Subcontractors Scheduling and planning documents (procedures, reports e.t.c.), monitor progress and control Project activities, verification of Milestones, identify potential delays, analyze and issue proposed corrective actions as required.

-       Utilize i-DMS (Integrated Document Management System) for various company document search and needs. Also utilize and operate SPR (Smart Plant Review) for equipment and construction viewing to check for its virtual location, position and some information.

Dec 30,’05 – Nov 05,'06       CAT International Co. Ltd. (CAT GROUP)

14th floor ABN AMRO Building, P.O. Box 250 Abu Dhabi, U.A.E.  

Planning & Scheduling Engineer/Project Controls

PROJECTS INVOLVED:

§         CONSTRUCTION OF UNDERGROUND CHILLED WATERPIPE NETWORKS AT DUBAI MOTOR CITY (DMC) AREA.

-          Client: Emirates District Cooling “EMICOOL”; Dubai, UAE.

-          Project Contract Duration: 10 October 2006 to 17 August 2007.

§          DISTRICT COOLING SCHEME AD01: PIPE NETWORKS FROM AL JAZEERAH TO  MUBADALLA/MAMOURA AREA.

-          Client: TABREED; Abu Dhabi, UAE.

-       Project Contract Duration: 01 August 2006 to 31 December 2006.

§         PHASE 5 TANK FARM EXPANSION DESIGN and CONSTRUCTION OF MECHANICAL, PIPING & CIVIL WORKS.

-          Client: VOPAK HORIZON FUJAIRAH LIMITED, (VHFL); Fujairah, U.A.E.

-          Project Contract Duration: 20 June 2006 to 19 December 2007.

§         AD02- AL BATEEN AIR BASE NEW BUILDING CONNECTIONS

-          Client: TABREED; Abu Dhabi, U.A.E.

-          Project Contract Duration: 05 March 2006 to 30 June 2006. 

§         TABREED DISTRICT COOLING SCHEMES Tabreed 5 Phase 2- EXTERNAL WORKS & ETS “Energy Transfer Station” Zone EC515A & 521

-          Client: TABREED; Abu Dhabi, U.A.E.

-          Project Contract Duration: 10 April 2005 to 26 July 2006

§         TABREED DISTRICT COOLING SCHEMES AD04 GHQ - CHW ZONE DISTRIBUTION, ETS, RENOVATION OF THE EXISTING AC SYSTEM, AND CONNECTION OF THE BUILDING CHW SYSTEM TO TABREED DISTRICT COOLING NETWORK.

-          Client: TABREED; Abu Dhabi, U.A.E.

-          Project Contract Duration: 08 October 2005 to 07 October 2006. 

§         Various Tendering Involved such as;

  

-          Emirates District Cooling LLC (EMICOOL) MOTOR CITY - DISTRICT COOLING PROJECT UNDERGROUND CHW PIPE NETWORKS at Dubai Investment Park, Jebel Ali, Dubai, UAE. Tender Planning Package.

-          ETS “Energy Transfer Station” Green West Project at Dubai, tender planning package.

-          International Media Production Zone (IMPZ) EMPOWER Project, tender up to level 2 package.

-          Engineering, Procurement & Construction of PIG LAUNCHERS AND RECEIVERS FOR 13 Nos. Critical Main Oil Lines, tender planning package. For (ADCO "Abu Dhabi Company for Onshore Oil Operations").

-          AD02- AL BATEEN AIR BASE NEW BUILDING CONNECTIONS.

-     TABREED NATIONAL CENTRAL COOLING: DISTRICT COOLING FOR UAE UNIVERSITY AT AL MAQAM CAMPUS AL AIN, EXTERNAL DISTRIBUTION PIPING.

§         Main Task:

-          Report directly to Project Manager. Execute document tendering. Preparation of Engineering, Procurement and Construction Project Schedule such as PERT/CPM, quantification, bar chart, progresses S curve, resources loading histogram, material take off, cost estimate and Monthly Cash Flow.

-          Monitor Weekly and Monthly Progress status at level 3 & 4 and procurement status. Gather and compile relevant data as per project requirement. Insure that all target dates as per schedule are properly executed. Conduct site ocular inspection Coordinate project heads.

-          Prepare recovery schedule to a certain project for client’s approval if additional quantity and extended schedule or which ever cases may apply.

-          Prepare monthly invoice/billing to be submitted to the client for approval with respect to the monthly progress.

-     Utilize Project Planning Software proficiently e.g. Primavera V3.1 and Microsoft Project 2000.

Dec 03,’02 – Oct 12, '05       Al Suwaidi Industrial Services Co. Ltd.

Supplied to Client: Saudi ARAMCO Testing and Inspection (T&I) and Projects Unit, Maintenance Div. Rabigh Refinery, Kingdom of Saudi Arabia.  

Planning /T&I and Projects Engineer

Duties and responsibilities:

§         Prepare Work Schedule for Tanks and various projects in accordance to SAES (Saudi Aramco Engineering Standards) and SAMS.

§         Prepares scope of work and letters for review by concern unit such as; Inspection Unit, Operation Maintenance & Engineering with Loss Prevention. As well as, review and give comments on various project design packages in accordance to standards and specifications.

§         Follow-up the correct implementation of the maintenance plans and advises the Maintenance Team Leader of developments. Gather work requests for each of the trades and inform the appropriate sections of work to be carried out during planned shutdowns. Analyze resource requirements (Manpower & Material, equipment & Tools) for shutdown work and ensure their availability well in advanced. Prepare a shutdown work package in consultation with Site Engineers and Supervisors.

§         Prepare calculation sheet, cost estimate, service/purchase order draft and bill of materials. Receive and analyze the monthly/quarterly cost control reports, review cost classification, compare actual costs against budget, and make appropriate comments to the concerned departments/services.

§         Prepare Long Form and Short Form Contracts. Hypothetical Quantities and Company “Saudi Aramco” Estimate Cost for Tankage Repair Western Region Shared Contract. Prepare T&I Planning and Projects Unit presentation. Verify & check contractors’ invoice against actual quantity of works completed.

§         TEST Package, Mid-Year accountability and Operating Plan preparation.

§         Coordinate the requirement for contracted manpower follow-up Service Orders/Purchase Orders & monitor expenditure in accordance with approved budget.


Mar 03,’04 – Apr 08, 2004            Saudi ARAMCO

Testing and Inspection (T&I) Planning and Projects Unit, Maintenance Div. Rabigh Refinery, Kingdom of Saudi Arabia.  

GRTA Shutdown Planner/Cost Engineer

Duties and responsibilities:

§         Perform the elements of shutdown planning through communication, time, cost and quality.

§         Estimating and controlling shutdown and turnaround cost.

§         Cost performance measures of the following;

1.             Labor

2.             Overhead

3.             Parts

4.             Material and supplies

5.             Rental and leasing costs

6.             General and Administrative

§         Produce the following documents:

1.             Progress daily report.

   2.            Contractors Back charges. 

Dec 26, ‘01Dec 02’02      Al Suwaidi Industrial Services Co. Ltd.

P.O. Box 269 Rabigh, Kingdom of Saudi Arabia.  

Planner Engineer/Quantity Surveyor

  • Prepare work schedule for tanks and various projects in Primavera V.3.1 and Microsoft Project 2000.
  •  Up date and report work progress daily for “all Project” using Microsoft Excel.
  • Maintain coordination with the project in-charge.
  • Monitor Cost for Al Suwaidi Serv. Co. Ltd. Rabigh ARAMCO Maintenance Div.
  • Prepare project billing and invoice prior for submission to Client and discuss.
  • Responsible for Weekly report in showing the GVWP, BCWP, ACWP and    company asset. Review, interpret and develop isometric Drawings.
  • Modify drawings in AutoCAD R14 or 2000.
  • Responsible for Scope of Work preparation.

 

Oct 2001 – Dec 25, ’01      Al Suwaidi Industrial Services Co. Ltd.

P.O. Box 269 Rabigh, Kingdom of Saudi Arabia.  

Mechanical Planner

  §         Prepare work schedule various mechanical projects in Primavera V.3.1. Monitor the 1.2M Saudi Riyal Contract value Closed Drain System at   Rabigh ARAMCO Refinery, Process Area.

§         Interpret, review construction progress if in accordance to plan and report to Project Manager.

  §         Responsible in maintaining communication with the Client SAUDI ARAMCO.


Mar 2000 – Apr 2001      SALCON POWER CO.

Poblacion Naga Cebu, Philippines  

Cadet  Planning Engineer

§         Prepare work schedule for tanks and various projects in Primavera V.3.0 and Microsoft Project 2000.

  §         Up date and report work progress daily for “all Project” using Microsoft Excel.

  §         Maintain coordination with the project in-charge.

§         Prepare reports, in daily, weekly and monthly report for mechanical work shop daily report.

§         Prepare Plant Integrity Assessment (PIA) report. 



Education:

   Cebu Institute of Technology                                    

Bachelor of Science in Mechanical Engineering

  • Graduated October 14, 2000
  • N. Bacalso Avenue Cebu City, Philippines

SIENA School of Naga

Graduated March 1996

  • East Poblacion ,Naga Cebu, Philippines
  • Received diploma

 

Naga Central Elementary School

Graduated March, 1992

  • Poblacion Naga Cebu, Philippines

 

Certificates:

 

Professional Regulation Commission                            December 14, 2001

Registered Mechanical Engineer

Board of Mechanical Engineer, R.P.

 

Personal Info:

DATE & PLACE OF BIRTH      :   September 07, 1979; Poblacion Naga   

                                                            Cebu Philippines

MARITAL STATUS                    :    Married

 

Seminars & Trainings:

   

    ELECTRO PNEUMATICS with PLC                        Apr 17, 2000-May 22, 2000

Cebu Institute of Technology

  • Cebu Institute of Technology at Automation Center
  • Cebu City, Philippines

LUBRICATION                                                                 January 19, 1999

Cebu Institute of Technology

  • Cebu Institute of Technology Audio Visual Room
  • Cebu City, Philippines

Automatic Computer Aided Design (AutoCAD)             Mar 22, 1998-Nov 1998

Cebu Institute of Technology

  • Conducted by Cebu Institute of Technology
  • N. Bacalso Ave. Cebu City, Philippines

MATERIAL DEGRADATION and PROTECTION         November 19, 1998

Cebu Institute of Technology

  • Cebu Institute of Technology Audio Visual Room
  • Cebu City Philippines

Reference: Available upon request.

No. of times visited