
The information below is not intended for employment. Employers, agencies and
other manpower recruiting resources must not treat this web site as for employment purposes. Thank you for viewing.
Objectives
To be part
with in a dynamic progressive company where I can use and apply my professional work experience. Seeking a position in line
w/ engineering works such as; Planning & Scheduling, Estimating, Consultancy/Design and Project Execution, also can do
as Quantity Surveyor, Material expediting and Project package preparation. To obtain a position in engineering, construction
and maintenance wherein my knowledge and experience will be used to the full extent.
Summary of Experience
With dedicated work experience in various technical and engineering disciplines. Works involved
in LNG Construction Process Area, Mining Plant Site, Mechanical Design, Piping, Chilled Water Piping (CHWP), Fabrication and
Installation, Project Planning preparation with the use of Primavera V3.1, P5/P6 & Microsoft Project in application of
SAP System & JD Edwards. Can be able to developed Designs and Drawings thru AutoCAD R.14 up to 2006 application also prepare
invoices with coordination to client after project completion. Previously engaged with multi-national, int’l. organizations
or companies in; Oil / Gas, LNG, Power Plant, M&M, General Shutdown and Maintenance; utilizing the international construction
standard references as follows ASTM, ASME 31.1 & 31.3, ASME IX, AWS, ASHRAE,
API & ISO 9001:2002 certification.
Detailed
Experience:
July 2011 – Present
MONADELPHOUS ENGINEERING
Address: Level 6 Lang Parade, Milton Queensland 4064
Australia
Planner/Scheduler
- Prepare tender schedules. Develop baseline schedule, monitor and coordinate with PM's and
construction personel for the project's success.
Projects: - Eurombah Creek APLNG Upstream Phase 1 – Gas Fields
Facilities JUL 2014 – MAY 2015
- Lead Planner : Wandoan Interconnect Facilities APLNG FEB 2014 – JUL
2014
- Wheatstone LNG Project 2013 - 2014
- Rio Tinto Kestrel Mine Brownfield CHPP Project 2011 - 2013
Sept. 22, ’08 – Feb
2011 SNC LAVALIN INTERNATIONAL INC. (Toronto, CA)
Ambatovy
“Nickel/Cobalt” Project (EPCM)
Client: OPG “Owner Project Group”(Sherritt Intn’l., Sumitomo and Korea Resources)
Fokontany d’ Amboakarivo, Commune
d’ Amboditandroho, TOAMASINA II - Madagascar
Snr. Planner/Scheduler
Report to Project Controls Manager, to ensure planning works for the Engineering,
Procurement, Construction and Management of the Ambatovy Nickel/Cobalt Project. Fact about the project; The Ambatovy Project is a laterite Nickel/Cobalt
open pit mining operation located in the east central highlands of Madagascar near the city of Moramanga. 220KM slurry pipeline
will be constructed, which will carry processed ore from the mine site to the processing plant as well as the a port, an eight
km railway, 130 km of access roads and an industrial complex. The processing plant will be constructed near the port city
of Tamatave (Toamasina) located on the east coast of Madagascar. The US $3.38 Billion facility will produce 60,000 tonnes per year of
Nickel, 5,600 tonnes per year of Cobalt and 185,000 tonnes per year of Ammonium Sulphate.
Duties and responsibilities:
-
Develop, maintain, and implement the Project Code of Accounts. Develop,
maintain, and implement the Cost Control Procedures. Prepare definitive capital cost estimate and Project budgets.
-
Evaluate and cost code capital cost commitments, expenditures, material
quantities, contractor’s man-hours, progress and performance, and project services.
-
Prepare Project trends and forecasts to update the Project final cost projections
to be included in the Monthly Progress Report. Prepare Bid check estimates of Bid Packages; assist Contracts and Procurement
in Bid evaluation and recommendations. Monitor the recording of commitments and expenditures in conjunction with the Project
Accounting Section. Monitor the Project scope and obtain approvals for Project Scope Changes.
-
Review Purchase Orders and Contracts for compatibility with the budget.
Also provide cost codes and budget breakdown values to Contracts and Procurement for Bid analysis and award recommendations.
-
Monitor supplier’s/contractors periodic reports to the Project Controls
Department.
-
Update the following documents in a Monthly basis:
o Master Summary
Schedule (Rainbow).
o Engineering
and Construction Progress Charts.
o The Detailed
Project (CPM) Schedule.
o Early Activities
Schedule.
o Overall contract
progress and performance curves.
o Contractors’
proposed and actual schedules, progress charts.
o Schedule requirements
to reflect any contractual or legal documentation and requirements.
-
Produce the following documents:
o Commitment
Package Status Report. Submit a Monthly Progress Report. List of Key Dates.
o Establish Intermediate
Milestones dates for Contract Documents.
o Overall Home
Office Progress Curve. Engineering Progress Curve. Manpower Status Report.
o Critical Items
List – Analyze “Actual“against the Schedule and report critical delays and needs to enable Management to
take corrective actions. Maintain “activity sorting” capabilities of the schedules.
o Produce Gantt charts for various special project reporting.
Dec. 20, ’06 – Jul.12,'08 CTJV- Chiyoda/Technip Joint Venture RGX6
RasGas
LNG Onshore Expansion Project Phase 2
Client: Partnership of RasGas
and ExxonMobil Ras Laffan (III) Limited
P.O.Box : 22740, Ras
Laffan Industrial City
(RLIC), State of Qatar
Snr. Construction Planner/Analysts
– Process
Report to Construction Manager, to ensure planning works of Construction
Group for CTJV, Japan's Chiyoda and France's Technip Joint Venture, for the engineering, procurement and construction
of the RasGas onshore projects trains 6 and 7. Two additional LNG trains, no. 6 and no. 7. This is a new offshore wells, the
largest producing wells in the industry. Each train is designed to produce 7.8 million tonnes per year of liquefied natural
gas, making them two of the world's largest LNG trains. ($4 Billion USD Project).
§ Main Task:
- Works involve in Construction Project Planning, extract detailed work activities, with Primavera V.3.1 and MS (Microsoft) Project 2003.risk management plan.
- Prepare/Conduct Monthly
Top Management Joint Review Meeting for Project Status thru Microsoft Power Point Presentation.
- Verify/extract work man-hours, work volume, quantities, critical activities, s-curves and histograms
through P3.
- Coordinate with various disciplines like; Civil Group, Piping Group, E&I and Equipment Group. As
well as coordinate to subcontractors relating to construction works for proper work execution at site and ensure proper planning.
Coordinate with logistics for the Material and Equipments ETA (Estimated Time Arrival) and ATA (Actual Time Arrived) prior
to allocating it to Laydown yard and/or installation.
- Update/submit Weekly Progress Report for all discipline thru S-Curves
and Histogram as well as various plans, for Process Access Roads, Equipment Positioning and alignment at Laydown area with
AutoCAD 2006 and (Bentley) Microstation. Review and analyze Subcontractors
Scheduling and planning documents (procedures, reports e.t.c.), monitor progress and control Project activities, verification
of Milestones, identify potential delays, analyze and issue proposed corrective actions as required.
- Utilize i-DMS (Integrated Document Management System) for various company document search
and needs. Also utilize and operate SPR (Smart Plant Review) for equipment and construction viewing to check for its virtual
location, position and some information.
Dec 30,’05
– Nov 05,'06 CAT International Co. Ltd.
(CAT GROUP)
14th floor
ABN AMRO Building, P.O. Box 250 Abu Dhabi, U.A.E.
Planning &
Scheduling Engineer/Project Controls
PROJECTS INVOLVED:
§ CONSTRUCTION OF UNDERGROUND CHILLED WATERPIPE NETWORKS AT DUBAI MOTOR
CITY (DMC) AREA.
- Client: Emirates District Cooling “EMICOOL”; Dubai, UAE.
- Project Contract Duration: 10 October 2006 to 17 August 2007.
§ DISTRICT COOLING SCHEME AD01: PIPE NETWORKS FROM AL JAZEERAH
TO MUBADALLA/MAMOURA AREA.
- Client: TABREED; Abu Dhabi,
UAE.
- Project Contract Duration: 01 August 2006 to 31 December 2006.
§ PHASE 5 TANK FARM EXPANSION DESIGN and CONSTRUCTION OF MECHANICAL, PIPING & CIVIL WORKS.
- Client:
VOPAK HORIZON FUJAIRAH LIMITED, (VHFL); Fujairah, U.A.E.
- Project
Contract Duration: 20 June 2006 to 19 December 2007.
§ AD02- AL BATEEN AIR BASE NEW
BUILDING CONNECTIONS
- Client:
TABREED; Abu Dhabi, U.A.E.
- Project
Contract Duration: 05 March 2006 to 30 June 2006.
§
TABREED DISTRICT COOLING SCHEMES Tabreed 5 Phase 2- EXTERNAL WORKS & ETS “Energy
Transfer Station” Zone EC515A & 521
-
Client: TABREED; Abu Dhabi,
U.A.E.
-
Project Contract Duration: 10 April 2005 to 26 July 2006
§
TABREED DISTRICT COOLING SCHEMES AD04 GHQ - CHW ZONE DISTRIBUTION, ETS, RENOVATION OF
THE EXISTING AC SYSTEM, AND CONNECTION OF THE BUILDING CHW SYSTEM TO TABREED DISTRICT COOLING NETWORK.
-
Client: TABREED; Abu Dhabi,
U.A.E.
-
Project Contract Duration: 08 October 2005 to 07 October 2006.
§ Various
Tendering Involved such as;
-
Emirates District Cooling LLC (EMICOOL) MOTOR CITY - DISTRICT
COOLING PROJECT UNDERGROUND CHW PIPE NETWORKS at Dubai Investment
Park, Jebel Ali, Dubai,
UAE. Tender Planning Package.
- ETS “Energy
Transfer Station” Green West Project at Dubai, tender
planning package.
- International Media Production Zone (IMPZ) EMPOWER Project, tender up to level 2 package.
- Engineering, Procurement & Construction
of PIG LAUNCHERS AND RECEIVERS FOR 13 Nos. Critical Main Oil Lines, tender planning package. For (ADCO "Abu Dhabi Company
for Onshore Oil Operations").
- AD02- AL BATEEN AIR BASE NEW BUILDING CONNECTIONS.
- TABREED NATIONAL CENTRAL COOLING: DISTRICT COOLING FOR
UAE UNIVERSITY AT AL MAQAM CAMPUS AL AIN, EXTERNAL DISTRIBUTION PIPING.
§ Main Task:
- Report directly to Project Manager. Execute document tendering. Preparation of Engineering, Procurement and Construction
Project Schedule such as PERT/CPM, quantification, bar chart, progresses S curve, resources loading histogram, material take
off, cost estimate and Monthly Cash Flow.
- Monitor Weekly and Monthly Progress status at level 3 & 4 and procurement status. Gather and compile relevant
data as per project requirement. Insure that all target dates as per schedule are properly executed. Conduct site ocular inspection
Coordinate project heads.
- Prepare recovery schedule to a certain project for client’s approval if additional quantity and extended
schedule or which ever cases may apply.
- Prepare monthly invoice/billing to be submitted to the client for approval with respect to the monthly progress.
- Utilize Project Planning Software proficiently e.g. Primavera V3.1 and Microsoft Project 2000.
Dec 03,’02 – Oct 12, '05
Al Suwaidi Industrial Services Co. Ltd.
Supplied to Client: Saudi ARAMCO Testing and Inspection (T&I) and Projects Unit,
Maintenance Div. Rabigh Refinery, Kingdom of Saudi Arabia.
Planning /T&I and Projects Engineer
Duties
and responsibilities:
§ Prepare
Work Schedule for Tanks and various projects in accordance to SAES (Saudi Aramco Engineering Standards)
and SAMS.
§ Prepares scope of work and letters for review by concern unit such as; Inspection Unit, Operation
Maintenance & Engineering with Loss Prevention. As well as, review and give comments on various project design packages
in accordance to standards and specifications.
§ Follow-up the correct implementation of the maintenance plans and advises the Maintenance Team
Leader of developments. Gather work requests for each of the trades and inform the appropriate sections of work to be carried
out during planned shutdowns. Analyze resource requirements (Manpower & Material, equipment & Tools) for shutdown
work and ensure their availability well in advanced. Prepare a shutdown work package in consultation with Site Engineers and
Supervisors.
§ Prepare calculation sheet, cost estimate, service/purchase order draft
and bill of materials. Receive and analyze the monthly/quarterly
cost control reports, review cost classification, compare actual costs against budget, and make appropriate comments to the
concerned departments/services.
§ Prepare Long Form and Short Form Contracts. Hypothetical Quantities and Company “Saudi Aramco” Estimate Cost
for Tankage Repair Western Region Shared Contract. Prepare T&I Planning and Projects Unit presentation. Verify & check
contractors’ invoice against actual quantity of works completed.
§
TEST Package, Mid-Year accountability and Operating Plan preparation.
§ Coordinate
the requirement for contracted manpower follow-up Service Orders/Purchase Orders & monitor expenditure in accordance with
approved budget.
Mar 03,’04
– Apr 08, 2004 Saudi
ARAMCO
Testing and Inspection (T&I) Planning and Projects Unit, Maintenance Div.
Rabigh Refinery, Kingdom of Saudi Arabia.
GRTA Shutdown Planner/Cost Engineer
Duties
and responsibilities:
§ Perform
the elements of shutdown planning through communication, time, cost and quality.
§ Estimating
and controlling shutdown and turnaround cost.
§ Cost
performance measures of the following;
1. Labor
2. Overhead
3. Parts
4. Material and supplies
5. Rental and leasing costs
6. General and Administrative
§ Produce
the following documents:
1. Progress daily report. 2. Contractors Back charges.
Dec 26, ‘01 – Dec 02’02
Al Suwaidi Industrial Services Co. Ltd.
P.O. Box 269 Rabigh, Kingdom
of Saudi Arabia.
Planner Engineer/Quantity Surveyor
-
Prepare work schedule
for tanks and various projects in Primavera V.3.1 and Microsoft Project 2000.
-
Up date and report work progress daily for “all Project” using
Microsoft Excel.
-
Maintain coordination
with the project in-charge.
-
Monitor Cost for Al Suwaidi
Serv. Co. Ltd. Rabigh ARAMCO Maintenance Div.
-
Prepare project billing
and invoice prior for submission to Client and discuss.
-
Responsible for Weekly
report in showing the GVWP, BCWP, ACWP and company asset. Review,
interpret and develop isometric Drawings.
-
Modify drawings in AutoCAD
R14 or 2000.
-
Responsible for Scope of Work preparation.
Oct 2001 – Dec
25, ’01 Al Suwaidi Industrial Services
Co. Ltd.
P.O. Box 269 Rabigh, Kingdom
of Saudi Arabia.
Mechanical Planner
§
Prepare work schedule various mechanical projects in Primavera V.3.1. Monitor
the 1.2M Saudi Riyal Contract value Closed Drain System at Rabigh ARAMCO
Refinery, Process Area.
§ Interpret,
review construction progress if in accordance to plan and report to Project Manager.
§ Responsible in
maintaining communication with the Client SAUDI ARAMCO.
Mar 2000
– Apr 2001 SALCON POWER CO.
Poblacion Naga Cebu, Philippines
Cadet Planning Engineer
§ Prepare
work schedule for tanks and various projects in Primavera V.3.0 and Microsoft Project 2000.
§ Up date and report work progress daily for “all Project” using Microsoft Excel.
§ Maintain coordination
with the project in-charge.
§
Prepare reports, in daily, weekly and monthly report for mechanical work
shop daily report.
§
Prepare Plant Integrity Assessment (PIA) report.
Education:
Cebu Institute of Technology
Bachelor of Science in Mechanical Engineering
-
Graduated October
14, 2000
-
N.
Bacalso Avenue Cebu City, Philippines
SIENA
School of Naga
Graduated March 1996
Naga
Central Elementary School
Graduated March, 1992
Certificates:
Professional
Regulation Commission
December 14,
2001
Registered Mechanical Engineer
Board of Mechanical Engineer, R.P.
Personal Info:
DATE & PLACE OF BIRTH : September 07, 1979;
Poblacion Naga
Cebu Philippines
MARITAL STATUS : Married
Seminars & Trainings:
ELECTRO
PNEUMATICS with PLC Apr 17, 2000-May 22,
2000
Cebu Institute of Technology
LUBRICATION
January 19, 1999
Cebu Institute of Technology
Automatic
Computer Aided Design (AutoCAD) Mar
22, 1998-Nov 1998
Cebu Institute of Technology
MATERIAL DEGRADATION and PROTECTION
November 19, 1998
Cebu Institute of Technology
Reference: Available upon request.
No. of times visited
|